Gold Ore Resources Ltd.
TSX-V:GOZ

 Mon Jan 18, 2010
Gold-Ore Reports Underground Drill Results at Bjorkdal

 Gold-Ore Resources Ltd. is pleased to report drill results from the on-going underground diamond drill program at the 100%-owned Bjorkdal Gold Mine in Sweden. Drilling continues to increase the dimensions of the orebody and is expanding reserves and resources at the mine faster than they are being depleted.

During 2009 the company drilled a total of 69 diamond drill holes (7,724 metres), including underground, open-pit and surface exploration holes at Ronnberget. The company plans to drill an additional 10,000 metres during 2010. This information will form the basis for a new reserve, resource calculation during 2010. Following are the significant results from the most recent underground holes.

Significant Drill Intersections

Drill Hole

Section

From (m)

To
(m)

Core Interval (m)

True Width (m)

Gold Grade (g/t)

2009-033

160 West

12.7

16.0

3.3

3.2

25.00

 

including

15.0

16.0

1.0

1.0

76.20

 

 

50.0

53.0

3.0

2.9

7.84

 

 

100.0

105.2

5.2

5.0

6.02

2009-034

120 West

5.2

6.2

1.0

1.0

108.00

 

 

18.3

20.4

2.1

2.0

3.36

 

 

39.2

41.7

2.5

2.4

3.41

 

 

159.1

160.0

0.9

0.9

16.70

 

 

174.4

177.1

2.7

2.6

6.57

 

 

201.2

203.2

2.0

1.9

2.49

2009-035*

120 East

50.1

52.1

2.0

2.0

3.20

2009-036*

120 East

71.3

73.3

2.0

2.0

5.43

 

76.3

80.3

4.0

4.0

3.98

 

96.9

99.6

2.7

2.7

21.56

 

including

98.8

99.6

0.8

0.8

71.30

 

104.4

106.4

2.0

2.0

5.17

 

108.3

109.2

0.9

0.9

110.0

2009-037*

120 East

59.4

61.4

2.0

1.9

2.80

 

 

96.1

97.1

1.0

1.0

7.26

136.4

137.4

1.0

1.0

57.3

2009-038*

140 East

60.5

63.4

2.9

2.9

3.56

 

 

98.3

100.2

1.9

1.9

4.07

 

 

136.6

138.6

2.0

2.0

7.24

149.8

150.8

1.0

1.0

88.3

2009-039*

140 East

48.6

51.6

3.0

2.9

25.97

 

 

63.7

65.7

2.0

1.9

4.09

 

 

140.2

142.2

2.0

1.9

60.23

 

including

141.2

142.2

1.0

1.0

119.00

 

 

146.2

148.2

2.0

1.9

7.63

2009-040*

140 East

19.2

24.1

4.9

4.9

2.36

 

 

37.6

41.6

4.0

4.0

3.49

2009-041*

140 East

31.5

33.5

2.0

1.9

51.32

 

including

31.5

32.5

1.0

1.0

96.40

2009-042

100 East

167.0

170.0

3.0

3.0

15.21

2009-043

100 East

61.7

64.6

2.9

2.9

8.54

 

 

86.1

88.1

2.0

2.0

3.18

* denotes drilled from Exploration tunnel

Exploration Drift
During 2009 an exploration drift was driven to give access for drilling on the extension of the orebody towards the north where previous surface drilling returned encouraging results. The diamond drill was placed in the tunnel in late 2009 and seven holes were completed: 2009-035 to 2009-041. These holes all intersected significant gold grades across mineable widths. The rig has been moved and the drift is now being extended with more drilling planned shortly.

These drill results are very significant from a long-term mine life perspective. Increasing the strike length in this part of the deposit provides a large upside in tonnage when factoring in the 40 or 50 known gold-bearing veins in the deposit. Continued success in this extension will significantly increase mine life.

Sample Protocol and Chain of Custody
In order to minimize the effects of the coarse nugget gold at Bjorkdal, the Company has elected to submit 100% of the core for analysis, rather than retaining half of the core for archive. This provides a much larger sample for gold analysis and theoretically a more representative result. The core is logged and photographed, and for the zones sampled, the entire core is shipped to ALS Chemex for gold analysis. A rigorous QA/QC program is employed that involves the insertion of blanks and certified standards.

About Gold-Ore

Gold-Ore Resources is a gold mining and exploration company focused in Sweden. The Company is generating positive cash flow, is debt-free and unhedged, and remains focused on increasing gold production from the 100%-owned Bjorkdal Gold Mine. In addition to Bjorkdal, the Company also has other assets in the country; the Ronnberget Gold Property (adjacent to Bjorkdal) and the Norrliden Polymetallic Deposit.

For more information please contact Glen Dickson, Bob Wasylyshyn or Ron Ewing at (604) 687-8884. Gold-Ore's project information is posted on the Company's web site at www.goldoreresources.com

ON BEHALF OF THE BOARD

Robert S. Wasylyshyn, President



The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.
 
 

You can view the Next News Releases item: Fri Mar 5, 2010, Gold-Ore Reports Increased Underground Resources at Bjorkdal Gold Mine

You can view the Previous News Releases item: Tue Jan 12, 2010, Gold-Ore Provides Operational Update for the Bjorkdal Gold Mine, Sweden

You can return to the main News Releases page, or press the Back button on your browser.




Show printable version of 'Gold-Ore Reports Underground Drill Results at Bjor...' in a New Window
Email 'Gold-Ore Reports Underground Drill Results at Bjor...' to a friend

Adnet Communications Inc.